Nickel Mine Blast Furnace Base

Nickel Mine Blast Furnace Base

imgWelding of Pan Segment Top Plate
Welding of Pan Segment Top Plate
imgWelding of Pan Segment Top Plate
Welding of Pan Segment Top Plate
imgCompleted Pan Segment Ready for Release from Fabrication Table
Completed Pan Segment Ready for Release from Fabrication Table
imgPan Segment Released from Fabrication Table
Pan Segment Released from Fabrication Table
img3D Digital Scan of Pan Segment for Accuracy Check to CAD 3D Model
3D Digital Scan of Pan Segment for Accuracy Check to CAD 3D Model
imgReleased Segment Scan Data
Released Segment Scan Data
imgPost Weld Heat Treatment of Segment
Post Weld Heat Treatment ( PWHT )
imgSite Installation of Pan Segment Blast Furnace Base
Site Installation of Pan Segment Blast Furnace Base
imgSite Installation of Pan Segment Blast Furnace Base
Site Installation of Pan Segment Blast Furnace Base
imgSite Installation of Pan Segment Blast Furnace Base
Site Installation of Pan Segment Blast Furnace Base

A highly challenging project on the extreme limits of fabrication capability with large full penetration welds throughout, extremely tight tolerances on flatness and position and with a requirement for 100% NDT testing. SPIIND's work scope on this project was to fabricate all ten segments forming the 20m diameter replacement base for this Nickel Mine Blast Furnace. 