LATEST PROJECTS

 

Tenix (BAE) Patrol Vessels

SPI secured the contract to build for Tenix (BAE) several in-shore and off-shore patrol vessel modules. SPI completed 2 x 28 tonne off-shore vessel modules, 3 x 22 tonne (aft modules) and 2 x keel and fuel modules. These were all successfully transported after hours (piloted) from our yard in Ruakaka up SH 1 to the port of Whangarei. SPI also fabricated all of the pipework for the fuel oil, lube oil, and cooling water systems.

 

View image gallery


 

Point Forward Project – New Zealand Refining Company

SPI was one of the main mechanical contractors for The Point Forward Project (PFP) for the New Zealand Refining Company.  Our involvement in this project was the fabrication in our Ruakaka workshop, of approximately 4 kms of process piping (carbon and stainless steel) ranging from 15mm (½”) up to 900mm (36”) diameter. After coating, fabricated piping and associated platforms were delivered to site for installation and erection. The off-site work kept 24 personnel engaged for more than 12 months and our on-site work kept an average of 40 personnel (peaking at 80) engaged for over 18 months.


View image gallery


 

Laminated Veneer Lumber (LVL) Project  - Carter Holt Harvey

The Laminated Veneer Lumber (LVL) project at Marsden Point, Northland saw SPI receiving and unloading more than 2,000 tonnes of processing equipment. The site works for this project included the erection and commissioning of the Dieffenbaccher LVL press, several hundred tonnes of in-feed and billet processing equipment for the Corvallis Tool Company and Raute equipment (both from the USA), plus installation of all hydraulic piping, hoses, pumps and control systems.

View image gallery